Anatomy of grid workflow automation

Utilities have no shortage of grid systems, yet the work between them still runs on repetitive calculations, manual data transfers and administrative handovers...

Client:
Product:
Location:

Introduction: The grid’s hidden bottleneck is the workflow

Look at an operator’s control room. It runs a number of powerful internal systems: SCADA, ADMS, GIS, OMS and many more. Alongside them sits a growing range of external systems and platforms, including metering services and flexibility marketplaces, as well as interfaces with electricity markets.

Despite the array of sophisticated systems, much of the work connecting them still relies on people re-running calculations, copying results between tools and chasing handovers and actions by email. Highly skilled engineers are being used as human middleware.

That model is breaking. In Great Britain, contracted demand connection offers nearly tripled in around seven months, from 41 GW to 125 GW, almost three times the country’s 45 GW peak demand [1]. In the United States, more than 2,000 GW of generation and storage was still stuck in interconnection queues at the end of 2025 [2]. Every request means more studies, more data transfers and more decisions, landing on teams that are already stretched.

Much of an engineer's day goes on pulling measurements from SCADA, metering and third-party platforms, then checking whether they can be trusted. It goes on re-running load flows before every switching operation, assessing constraints by hand, and working out which flexibility services to call and when. It goes on dispatching instructions, confirming that assets responded, settling services afterwards and writing reports for regulators and market parties. Then the shift changes, and the context is passed on by email, phone call or spreadsheet.

Each manual step adds delay. Each copy-paste adds the risk of an error, and each handover adds a queue. In operations, delay is not just inefficiency. It is lost value, curtailed customers and avoidable risk on the network.

This is skilled time spent on unskilled tasks, at a time when that expertise is increasingly scarce. The power sector needs between 450,000 and 1.5 million more power engineers by 2030, while around 15% of today’s power engineering workforce plans to retire within the next decade [3].

You cannot hire your way out of this. You cannot spreadsheet your way out of it either.

The opportunity is clear, remove the repetitive calculations, manual transfers and administrative handovers, and keep the engineering. Automation should not replace engineers. It should give them their time back.

‍

Connecting systems, not replacing them

Integration is not a new challenge. Over the years, utilities have considered two main approaches to make their systems work together (see Figure 1). Both made sense at the time but neither scales to what grid operations now demand.

Figure 1: Three approaches to integrating grid systems: point-to-point integration, rip-and-replace, and a common operational foundation.

The first is point-to-point integration: a new interface for every pair of systems. SCADA connects to ADMS, ADMS to GIS, metering to analytics, forecasting to the flexibility market. Each interface is built for a single purpose, owned by a single team and maintained on its own. The maths is unforgiving. Eight systems can require up to 28 interfaces, and twenty up to 190. Every software upgrade, data model change or new platform can affect multiple interfaces.

Over time, interfaces drift, documentation falls behind and the integration landscape becomes a system in its own right, one nobody designed and few fully understand.

The second is rip-and-replace: swap the existing estate for one new all-in-one platform. It is a huge undertaking involving multi-year migrations, risk to live operations, retraining and vendor lock-in. Even when it succeeds, it only resets the clock. New platforms, markets and data sources keep arriving, and eventually the replacement becomes the next legacy system, facing the same integration pitfalls.

There is a third way: connect once, build on top. As illustrated in Figure 1, existing systems stay in place. Each connects to a common operational foundation that shares data, network models and workflows. New capabilities, whether forecasting, network analysis, optimisation, control or third-party applications, plugs into that foundation rather than into every individual system.

Add a new system, and you add one connection, not ten. Automate a workflow, and it runs across the whole estate, not across a fragile chain of bespoke links.

‍

Automating the routine, not the judgement

Consider a familiar example: a grid operator managing its network alongside flexibility and electricity markets. The exact steps vary from utility to utility, but the pattern is remarkably consistent (Figure 2, left).

An engineer logs in to one or more platforms to collect and download measurements. The data is normalised and imported into an analysis tool, where forecasts and power-flow studies are run. Then comes the slow part: benchmarking a number of candidate operating scenarios to find the most attractive one. The chosen actions, such as dispatch instructions, are copied and handed over to other teams, for dispatch or uploading bids to marketplaces for trading. The engineer then waits for outcome data to arrive, validates it and audits the result. At regular intervals, reports must be prepared for colleagues, managers and regulators, pulling numbers into spreadsheets, building graphs by hand, writing the commentary and formatting the same reports again and again. Every step depends on the engineer but most do not require the engineer’s expertise.

SMPnet’s Grid Workflow Automation turns that sequence around (Figure 2, right). Data collection, normalisation, studies, scenario ranking, dispatch, validation and reporting run automatically, triggered by schedules, events or market windows. Engineers step in at defined intervention gates, the points where their skills add the most value:

  • Identifying the key points in the analysis: Deciding which constraints, risks or anomalies really matter today.
  • Selecting the action scenario: Choosing between ranked options, with full visibility of the technical and commercial trade-offs.
  • Discussing the audit with the team: Reviewing what happened, what worked and what should change next time.

This approach is also what prepares utilities for the challenges ahead. Distributed energy resources are multiplying, flexibility markets expand and electrification increases.  With every new asset, market window and service adds another cycle of data, studies, decisions and reports. A manual workflow can only grow by adding people. An automated one grows with the network, while the intervention gates keep engineers in control of the system.

Every automated step is configurable and fully logged. Nothing happens that cannot be traced, explained or overridden.  The goal is not to take engineers out of operations but to automate the routine, so they can focus on decisions that shape the grid.

‍

Figure 2: Market-facing grid operations workflow: manual today (left) and automated with engineer intervention gates (right).

‍

Grid workflow automation in practice: How SMPnet delivers it

At SMPnet, Grid Workflow Automation isn't a concept. It's what we're delivering to grid operators today: technology built for the realities of critical national infrastructure.

  • Every protocol, every system. We support the full range of protocols, from operator-grade OT systems and SCADA to automation and market platforms. New systems, partners and data sources are connected once, without building another fragile point-to-point link.
    ‍
  • All interfaces in one dashboard. Configurable panels bring every system, measurement and workflow into a single view. Engineers can work from the same operational picture without switching between tools and logins, reducing handovers and the risk of information being lost.
    ‍
  • Reporting for every audience, at every interval. Reports are generated automatically for different groups at different frequencies: engineers daily, managers weekly, regulators and partners as required.  The right information reaches the right people on time, consistently without manual preparation of graphs and reports.
    ‍
  • Configurable automation across multi-tenant systems. Automation cycles can be configured for each operator and coordinated across organisations, for example between a TSO and a DSO.  Each party keeps its own rules, data boundaries and operating rhythm while working together on shared processes.
    ‍
  • Full lineage and auditability. Every result can be traced back to its source data, the model version that produced it and the decision taken on it. Engineers can explain, verify and override any action, and regulators have access to supporting evidence.
    ‍
  • Integrated forecasting, power flow and optimal power flow. The analysis engines are built into the workflow itself. Forecasts feed optimal power flow directly, and the results are validated through power flow. Iterations are managed automatically to give operators multiple options based on the same network model. This removes manual exports between tools, mismatched models and delays between studies. Allowing congestion to be identified, assessed and resolved in a single continuous cycle, quickly enough to act before the problem reaches the network.
    ‍
  • Parallel instances and what-if scenarios. Multiple workflow instances run side by side, each with its own data, assumptions and settings. Operators can test what-if scenarios involving forecasting, network outages, flexibility strategies or market conditions alongside live operations without affecting live workflow. Scenarios can be safely stress-tested before selecting the preferred option and moving it into live operation.
    ‍
  • Secure, flexible deployment. Automated workflows can run on-premises, in the cloud or through hybrid installations, built around each utility’s security, data control and operational requirements. Operators retain control over where workflows and data live, keeping operational systems inside their own security boundaries, and using the cloud where it adds value.

‍

Deployment example: Flexibility coordination

Figure 3 shows one of our live deployments, which coordinates local flexibility across distribution grid areas. Telemetry flows in from community energy and monitoring platforms (1). SMPnet forecasts each feeder and detects upcoming thermal and voltage congestion (2). It places flexibility orders on a marketplace (3), where flexibility service providers (FSPs) submit bids and settlements are handled (4). Customer batteries are then dispatched behind the meter during the required window (5), and automated reports are issued to every stakeholder (6).

Figure 3: Automated end-to-end flexibility coordination workflow: from telemetry to dispatch and reporting.

‍

Every step runs automatically. The results over 655 days of operation are shown in Figure 4. Across around 180 assets connected to two substations, the platform has carried out 38,039 forecasting runs and 37,313 power-flow and optimal power-flow studies. It has handled 24,651 flexibility orders, 15,512 trades and 586 settlement pulls, and sent 768 automated reports. It also resolved 701 system-wide errors automatically, with zero disruptions. On the network, this has avoided 2,250 minutes of thermal congestion across three communities, and 57 overvoltage events have been detected and acted on proactively.

Figure 4: Flexibility coordination results over 655 days of live operation.

Now consider what this means at scale. Two substations already require around 115 forecasting and power-flow studies every single day. Extend that to 200 substations, and the figure rises to more than 11,000 studies a day. Even at just five minutes per study, that would take around 120 engineers working full time, doing nothing but running studies.

That is not a workforce any utility can hire. It is a workload only automation can carry.

As distributed energy grows, flexibility markets mature and net-zero targets bring ever more systems to orchestrate, flexibility coordination will need to expand to every substation on the grid. The same automated workflow that runs across two substations today is built to scale with it, without adding a single manual step.

More workflows in delivery and development

Flexibility coordination is just one application of SMPnet's Grid Workflow Automation. The same approach is already being applied to other operational workflows, including the following three examples.

TSO–DSO coordination: Traditionally, a TSO sends a day-ahead request to a DSO in a spreadsheet. The DSO runs offline scenarios and usually replies with a simple yes or no, with limited supporting evidence or auditability.

With Grid Workflow Automation, the TSO’s request, for example 800 MW, is ingested directly through an API. Multiple scenarios are then run automatically to accommodate it, and each one is validated through integrated power flow. The DSO is presented with feasible options and their technical and commercial implications. For example, Option A might deliver 790 MW, with its cost, losses and technical implications clearly set out. Once the DSO selects the option, the workflow responds to the TSO, implements dispatch, collects the delivery data and submits the evidence for payment and audit.

TSO stability management: Stability assessments traditionally involve engineers combining measurements from SCADA, metering and separate stability tools, running studies offline or periodically, and evaluating options one at a time. Under time pressure, this can lead to conservative decisions, chosen with limited visibility of the alternatives and their associated risks.

With Grid Workflow Automation, telemetry from SCADA and metering systems is ingested alongside system stability indices. Available stability services are assessed in parallel, with their potential impact and risk. The TSO receives a range of options, supported by the evidence needed to make an informed decision.

Substation asset health indexing: Asset health traditionally relies on periodic inspections, alarms in separate systems and manually compiled data. Equipment temperatures and metrics sit in local substation automation systems, while backups and fault reporting often require manual intervention.

With Grid Workflow Automation, data from substation automation systems, including health metrics, temperatures, and equipment status, are collected continuously and turned into live health indices. The workflow also automates backups and restoration, while alarms and notifications are raised directly in the operator's ticketing systems.

Together, these examples demonstrate how Grid Workflow Automation can be applied across a wide range of grid operations, from system coordination and stability management to asset monitoring and maintenance.

Automate your workflows with us

If any of these challenges sound familiar, or you have a workflow your engineers would rather not run by hand, let’s talk. Get in touch with the SMPnet team to discuss your use case and explore what Grid Workflow Automation could do for your operations.

‍

References

[1] Ofgem, Demand Connections: Call for Input, February 2026. https://www.ofgem.gov.uk/sites/default/files/2026-02/2026-02-12-Demand-Connections-Call-for-Input.pdf

[2] Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition – Characteristics of Power Plants Seeking Transmission Interconnection as of the End of 2025. https://emp.lbl.gov/queues

[3] IEEE Power & Energy Society and Kearney, The Future of the Energy Workforce, July 2025.

‍

‍